Are Redlines and as Builts the Same?

These documents will be included in the "final set" of drawings and specifications that are provided to the owner. There are two ways in which the redlines are transformed into as builts. ... This process may work for some projects but an issue arises when multiple contractors have as-builts on the same document.

Are record drawings the same as as builts?

As-Built vs.

On the original construction documents and drawings, the as-built changes are made by the contractor in red ink. ... A record drawing is the final compiled drawing prepared by the architect himself/herself. These drawings mark the notes of the on-site changes that the contractor makes in the As-Built Drawings.

What is the difference between Redline and as-built drawings?

The Difference

Redline Markups are edits you make along the way, while construction is ongoing. You will need these for approval before making the changes. As Built Drawings are your final drawings, comparing the original design against the final alterations after everything has been completed.

Chloe Bennett

Chloe Bennett

Culture, Media & Entertainment Columnist

Chloe Bennett explores the intersection of pop culture, streaming entertainment, digital trends, and contemporary lifestyle. Her weekly commentary reaches thousands of culture enthusiasts.